Planningvia East Riding of Yorkshire Council Planning
Submission of details required by Conditions 5 (layout, drainage, construction, Utilities and lighting of the propose...
Submission of details required by Conditions 5 (layout, drainage, construction, Utilities and lighting of the proposed service road(s)), 8 (cycle parking facilities), 9 (footpath/cycle links), 10 (hig
Submission of details required by Conditions 5 (layout, drainage, construction, Utilities and lighting of the proposed service road(s)), 8 (cycle parking facilities), 9 (footpath/cycle links), 10 (highway connection), 13 (Wildlife Enhancement Plan), 15 (remediation measures identified in section 9.4 of the Phase II Geo-Environmental Investigation Report), 18 (Noise Impact Assessment), 20 (Construction Management Plan), 21 (surface water drainage), 22 (surface water drainage), 24 (foul and surface water drainage), 26 (Construction Environmental Management Plan (CEMP)), 27 (landscaping details), 31 (Noise Impact Assessment (Acoustic Fence Detail)) of planning permission 25/00127/STVAR
Address: Site Of Peter Haddock Limited Pinfold Lane Bridlington East Riding Of Yorkshire YO16 6XS
Ref: 26/30397/CONDET
Type: Approval of Details req'd by Condition
Status: Pending Consideration
Ward: Bridlington North
Consultation ends: 2026-09-08

Comments
No comments yet. Be the first to share your thoughts!